Convert Cubic Yards to Tons of Gravel
Multiply the cubic yards by the material’s density in tons per cubic yard. For ordinary gravel and crushed stone that figure is between about 1.28 and 1.35 US tons, so ten cubic yards is somewhere near thirteen tons. Going the other way, divide the tons by the same number.
The multiplication is not the hard part. Two other things decide whether the lorry that arrives carries what you meant to buy: the density you used, which is a property of that specific pile and not a constant, and which of the three weights called a “ton” the two of you had in mind. The second of those is a ten per cent error sitting in plain sight.
Where the Conversion Factor Actually Comes From
Nothing about this is a lookup. A cubic yard is three feet by three feet by three feet, so it holds 27 cubic feet. Densities for aggregates are usually quoted in pounds per cubic foot. A US short ton is 2,000 pounds. That is the whole derivation:
| Step | Working | Result |
|---|---|---|
| Cubic feet in a cubic yard | 3 × 3 × 3 | 27 ft³ |
| Weight of one cubic yard | 27 × 100 lb/ft³ | 2,700 lb |
| Converted to short tons | 2,700 ÷ 2,000 | 1.35 tons/yd³ |
Change the 100 and everything downstream changes with it. That one number is doing all the work, and it is the one nobody checks. Our gravel calculator runs exactly this arithmetic and shows which density produced the weight, so you can see what it assumed rather than take the tonnage on faith.
The Density Table Is a Range, Not a Constant
Published densities for the same named material disagree, and they disagree for a reason: screened size, the shape of the stone, the rock it was crushed from and how wet the pile is all move the figure. These are the values behind the calculator, with the conversion worked out for each:
| Material | lb/ft³ | Per cubic yard | Short tons/yd³ | Tonnes/yd³ |
|---|---|---|---|---|
| Crushed stone | 100 | 2,700 lb | 1.35 | 1.225 |
| Crushed limestone | 100 | 2,700 lb | 1.35 | 1.225 |
| River rock | 99 | 2,673 lb | 1.337 | 1.212 |
| Pea gravel | 96 | 2,592 lb | 1.296 | 1.176 |
| Decorative gravel | 95 | 2,565 lb | 1.282 | 1.163 |
| Lava rock | 50 | 1,350 lb | 0.675 | 0.612 |
Across the five ordinary materials the spread is about four per cent, which on a twenty-ton order is most of a ton. Lava rock is the reminder that “gravel” is not one substance: at half the density of crushed stone, a ton of it covers twice the ground, and any figure you carried across from a previous job would be wrong by a factor of two.
Treat the table as a starting point for an estimate and the supplier’s own figure as the one to order against. They measured their stockpile. Nobody writing a table measured yours.
Three Different Weights Are Called a Ton
This is the error that costs real money, because nothing about it looks like an error. The same pile of stone has three correct answers depending on which ton is meant:
| Unit | Equals | Used in | One yd³ of crushed stone |
|---|---|---|---|
| Short ton | 2,000 lb | United States | 1.35 |
| Metric tonne | 1,000 kg (2,204.6 lb) | UK, EU, most of the world | 1.225 |
| Long ton | 2,240 lb | Older UK usage | 1.205 |
A short ton figure is 10.2% higher than the same stone expressed in tonnes. Order 6.7 of one when you meant the other and you have either paid for two thirds of a ton you cannot use or left your base short. British suppliers usually mean tonnes even when they write “tons”, and American suppliers mean short tons. If the quote does not say, that is a question worth asking before it is a delivery worth arguing about. Our unit conversion calculator handles the weight conversion if you are checking someone else’s figure.

A Driveway, Start to Finish
Forty feet long, ten feet wide, four inches of stone. The depth has to go into feet before anything else happens, and four inches is a third of a foot:
| Step | Working | Result |
|---|---|---|
| Volume in cubic feet | 40 × 10 × 0.333 | 133.33 ft³ |
| Volume in cubic yards | 133.33 ÷ 27 | 4.94 yd³ |
| Weight at 100 lb/ft³ | 133.33 × 100 | 13,333 lb |
| In short tons | 13,333 ÷ 2,000 | 6.67 tons |
| In tonnes | 13,333 lb → 6,048 kg | 6.05 tonnes |
Order five cubic yards and you have a little spare. Order “about seven tonnes” because 6.67 rounded up in your head and you have bought about 16% more stone than the drive needs — roughly two thirds of that from the unit and the rest from rounding up. Work out the percentage difference between two quotes before deciding one is better value: quantities this close together are easy to misread.
Rain Adds Weight Without Adding Stone
Loose gravel is not solid rock. Perhaps a third of the pile is air between the stones, and when it rains that space fills with water. Water weighs about 62.4 pounds per cubic foot, so the sum is straightforward:
- A third of the volume as air, half of it wet, adds 0.333 × 0.5 × 62.4 = 10.4 lb/ft³ — about a tenth more weight.
- The same pile fully saturated adds 20.8 lb/ft³, or a fifth more.
None of that water is stone. If you buy by weight after a wet week, part of what you pay for drains into the ground. If you buy by volume it does not matter, which is one honest argument for ordering in cubic yards where you have the choice. The exact void fraction varies with how well graded the material is, so treat those two figures as the shape of the effect rather than a measurement of your pile.
Why Deliveries Come Up Short
Almost always one of these, and the first is the most common:
- The depth was never converted. Four inches entered as 4 rather than 0.333 inflates the volume twelvefold. It is such a large error that it usually gets caught — but the reverse, entering 0.33 where the quote assumed inches, quietly under-orders.
- A compacted depth was costed as loose volume. The densities here describe material as delivered. A sub-base that gets rolled takes more than its finished depth suggests.
- Tons and tonnes were swapped. Ten per cent, every time, in whichever direction hurts.
- A density was borrowed from a different material. Lava rock against crushed stone is a factor of two. Mulch against gravel is worse, which is why mulch has its own calculator rather than sharing this one.
What to Ask Before You Order
Four questions, and they take a minute between them. Ask whether the price is per cubic yard or per ton, and if per ton, whether that is a short ton or a tonne. Ask what density they use for the material you are buying. Ask whether the figure is for dry or as it currently sits in the yard. And ask what they would allow for compaction at your depth, if the stone is going under something.
The arithmetic on this page will not fail you. The assumptions underneath it are what decide whether the delivery is right, and the supplier is the only person who knows them.